3.2.5.1 The State will supply the Contractor with light, heat, power, hot and cold water for the cleaning of the building. (NOTE: hot water temperature is regulated by the State’s energy guidelines and cannot be increased above the current guideline temperature.) 3.2.5.2 The State will provide janitorial closets for the housing of the Contractor’s equipment and supplies. These closets will be supplied with locks to safeguard the Contractor’s property. These closets must be maintained in a clean, neat, and orderly condition by the Contractor. Keys to the janitorial closets will be the responsibility of the Contractor. Should the Contractor lose these or any other building keys, they shall be responsible for the cost of replacing or re-keying the locks so affected. 3.2.5.3 The State will supply large trash receptacles (dumpsters) for the final disposal of trash collected in the building. The Contractor shall deposit all trash collected in the building in the receptacles provided and insure that all lids, doors, or other openings to the receptacles are closed and latched.