Demo existing concrete stair and metal handrail. Remove existing limestone ledge cap for refinishing and reset in original location on masonry walls. Demo existing concrete landing and bearing walls. Remove portion of existing masonry at end of mall in preparation for new end wall masonry. Salvage existing brick as needed. Demo existing (non-energized) light fixture and any wiring, electrical boxes, conduit, etc. Remove existing charred finishes, clean and prep surface for new masonry anchors. Prep top of wall for new concrete parapet cap. Remove exterior layer of brick and temporarily shore opening for installation of salvaged concrete signage. Install new 1 1/1” diameter steel pipe handrail with integrated lighting. Rake back mortar and apply sealant joint. Modify existing grade to slope up to landing; maximum distance between landing and grade not to exceed 30” Install New HSS 6” x 6”x 1/4” Steel column and structural HSS Tube Steel Beam. Install New Landing (4” Concrete Slab-on-Grade) Install new 8” Reinforced CMU Wall with connection to existing masonry. Install new Metal Panel Exterior Finish.