SCOPE OF WORK 1, GENERAL 1. The CONTRACTOR shall comply with all applicable Federal, State and Local codes, ordinances and requirements of all agencies having jurisdiction. The CONTRACTOR will be responsible for obtaining all necessary licenses to complete the scope of work. 2. Performance: The quality of workmanship concerning the Pump and Haul of Landfill Leachate must reflect professionalwork and conduct. 2. SCOPE OF WORK Time is of the essence in all work performed under this Scope of Services. The Pump & Haul services are limited to the collection and disposal (Pump and Haul) of landfill leachate that may pose a threat to public safety and/or pose a threat to the environment. 1. The CONTRACTOR will typically load (Pump) and Haul the landfill leachate from the New Hanover County Landfill (leachate lagoon) to manhole 114713 (near Ogden Park), approximate one-way distance is 16.9 miles. The leachate will be off-loaded by gravity or pumped into the Cape Fear Public Utility Authority treatment system. The discharge rate shall not exceed a rate greater than 300 gallons per minute (gpm). CFPUA may designate two alternate disposal sites be used. Those are: the James A. Loughlin (Northside)Wastewater Treatment Plant (NSWWTP) - 2311 N 23" St, Wilmington, NC 28401; and the M'Kean Maffitt (Southside) Wastewater Treatment Plant (SSWWTP) - 3436 River Road, Wilmington, NC 28412. 2. The CONTRACTOR will be responsible for any damages caused by the CONTRACTOR to both private and public property and shall immediately report any damage incidents to New Hanover County. 3. The CONTRACTOR shall be responsible for establishing and scheduling disposal routes in consultation with COUNTY staff. 4. The CONTRACTOR shall provide an updated list weekly of subcontractors including subcontractor name, contact person, address and telephone number. 5. Disposal trucks shall be identified by labels indicating it as a "New Hanover County Contractor". 6. Collection and disposal (Pump and Haul) of the landfill leachate shall be restricted to between the hours of 8:00am and 4:00pm. 7. The COUNTY reserves the right to determine the final resolution of any discrepancy or conflicts, 8. The CONTRACTOR shall ensure that each disposal truck used for the Pump and Haul of leachate is clean and free of potential contaminants prior to use. g. The CONTRACTOR shall provide a cleaning certificate, prior to the use and after each different use of any tanker for Pump and Haul, to New Hanover County staff