Base Bid: Contractor shall provide all labor, materials, equipment, supervision and permitting to overlay Oscar Scherer State Park existing asphalt roadway in two segments in accordance with the contract documents. Alternate #1: Shall consist of clearing the entire site remove existing base and sub-base. Install new sub-base, base and asphalt pavement for the parking area. Creating 12 parking spaces (which includes 1 handicap space) with wheel stops and painted striping and install 2 stop signs and stop bars. Alternate #2: Shall consist of installing new sub-base, base and asphalt pavement, creating 8 parking spaces with wheel stops and painted 6" striping, also the existing wood fence along the southwest side shall be removed and replaced as shown(in the plans).