To replace flooring per the project requirements provided below: a. Contractor to remove and properly dispose of all old flooring materials and base in areas as indicated on the attached floor plan, Exhibit “1”. Contractor shall only remove the quantity of flooring that can be replaced every day with the new flooring, as the facility shall be returned to normal conditions at the end of every workday. b. Contractor to furnish and install new carpet with new cove base, thresholds, and any transition strips needed for a complete, turnkey, ADA compliant system as indicated by the floor plan, Exhibit “1”. c. Contractor will be responsible for moving the furniture prior to removal of the existing carpet. All furniture shall be placed in its original location after installation of the new carpet. County will be responsible for disconnecting, moving, and reconnecting all computers, printers, and all personal items in the space. d. Contractor to use only Manufacturer approved adhesives, additives, and accessories, and all existing mastics, glue, adhesives shall be removed prior to new flooring installation. e. Contractor to provide an additional 10% of flooring and cove base as attic stock to be stored by FMD and used for future repairs.