● Disconnect and remove the old chiller. The chiller shall be removed safely and shall not damage any of the building or grounds. If damage occurs, contractor shall be responsible for repairing back to original condition. Any tools/equipment needed for removal and re-installation shall be the responsibility of the contractor. The unit shall be disposed of properly, meeting all requirements established under section 608 of the Clean Air Act. ● Any required alterations to the equipment pad shall be the Contractors responsibility. ● Supply and install indoor water cooled Chiller per specifications. The design is based on Carrier Model 23XRV3232NQVAA50–. ● A BCS Operations Manager and/or Project Manager must be present and sign off on the new Chiller when delivered on site. ● All piping shall be supported in a sound mechanical means. All supports and brackets are to be galvanized or painted (2 coats) with a rust inhibiting paint. A 4x4 plate to be welded to the support, closed at the top and anchored to the pad.