0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 100 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 4 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 20 0006 100100 DEVELOP WATER SUPPLY LS LUMP SUM 0007 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0008 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0009 120101 TRAFFIC CONTROL SUPERVISOR DAY 50 0010 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 2 0011 120110 FLASHING ARROW SIGN EA 14 0012 120119 TRAFFIC CONE EA 87 0013 120120 TYPE III BARRICADE EA 110 0014 120151 TEMPORARY TRAFFIC STRIPE (TAPE) LF 15,700 0015 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 328,000 0016 120165 CHANNELIZER (SURFACE MOUNTED) EA 1,670 0017 120205 PORTABLE FLASHING BEACONS (EA) EA 2 0018 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 20 0019 124000 TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM 0020 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM