1. Excavation and repair of pressure and gravity lines at varying depths. Contractor shall provide all crew and equipment necessary to repair the pressure and gravity lines. It shall be the responsibility of the contractor to notify 811 and verify and protect utilities. 2. Traffic control, including but not limited to lane closures, intersection closures, road closures, variable message board utilization and light tower utilization. Contractor shall provide all signs, cones, barricades, and other related or required traffic control devices, vehicles, trailers, etc. to meet the NCDOT standards of the Manual on Uniform Traffic Control Devices ("MUTCD"). Contractor is responsible for traffic control planning and approval by any jurisdictional regulating agency. Contractor is responsible for delivery of all materials to the work site, fuel or power maintenance requirements, transportation, set up and demobilization. 3. Water services. Contractor shall perform services in connection with short side and long side water service and tap installation and/or repair. Union County will supply all meters. 4. Sewer services, by open trench or bore methods and up to 200' of piping. 5. Removal and disposal of all excavated materials. 6. Final restoration - Contractor shall be responsible for all permanent restoration of all excavations. (i.e., concrete, pavement, grass, etc.)