Task 1: Water System Modeling ($14,210) 1. Review of provided design drawings and “Water System Study for CHP Academy” report (study) dated 10/21/2019. 2. Development of Water Model to verify line sizes and orientation will meet the Academy’s water demands and pressures. The model will include existing conditions as well as existing-to remain, plus proposed. 3. Prepare report that summarizes findings as well as compare the results of the Water Model and the results presented in the study and summarize any differences. Existing fire flow data, as well as existing and anticipated demands will be provided. Task 2: QA/QC Review ($18,018) 1. QA/QC review of the 95%-complete construction documents (plans and specifications), prepared by DGS and provided electronically via PDF. 2. Any comments will be documented digitally on the PDF and provided to DGS for review/consideration. 3. A detailed virtual meeting will be held to discuss comments. Task 3: Opinion of Probable Construction Costs (OPCC) ($12,000) 1. Development of an OPCC based on the 95%-construction documents that will include construction costs to fully execute the project. This will contain a 10% contingency and will be in present dollars.