This project will consist of an interior remodel to the CMD office to convert an existing framed cubical workstation space into a conference room. Work will include selective demolition, framing modifications, acoustical ceiling modifications, casework, wood trim, glazing, doors and hardware, flooring, lighting, electrical and interior finishes Work Scope: 1. Selectively Demo office area space to complete the remodel. Including cubical walls, door openings, flooring, electrical, low voltage and partial ceiling grid. 2. Contractor shall provide and utilize temporary protection of the surrounding office space via Zipwall or similar barrier system. Protect all surrounding spaces and areas during construction activities. Provide and utilize HEPA air filtration / air scrubber during dust producing operations to minimize return air contamination. 3. Frame conference room space according to the floor plan to structure above. Provide backing support for sliding door hardware tracks and TV mount. Coordinate layout with Project Manager. 4. Selectively demo, modify and install electrical and low voltage according to plan. 5. Provide and install drywall finishes, tape, sand and paint. Restore any surrounding finishes affected by this work. Patch and paint existing CMD Break Area room. 6. Prepare subfloor for installation of new LVT flooring by removing old carpet adhesive, patching and filling of plywood substrate. Shaw Contract Solitude 6”x48” plank fully adhered. Install 4” vinyl base. Owner to select colors. 7. Install pre-finished red oak cased window openings, glazing, stops and casing. Match existing half wall cap finish. 8. Provide and install new rolling barn door slabs, hardware, jamb stops and gaskets. Rolling door hardware: Johnson Hardware 2610S362 for double sliding door. Johnson Hardware 2610F72S for single doors. Door Slabs to be Masonite Stile and Rail Oak 4 glass lite doors. Include door pull handles, Oak parting stops on door opening interior with continuous brush gaskets for acoustical sound control. 9. Modify surrounding open office acoustical suspension grid system with new perimeter wall angles on the new walls. Install new grid system within the new conference room space per plan. (USG Fineline DXF 9/16” grid system. USG Mars Fineline Bevel 86985 2’x2’). Replace ceiling tiles in the existing CMD Breakroom. 10.Modify sprinkler heads within the space to provide adequate coverage. See RCP