1.WINDOWS: Replace the existing windows with new single-hung vinyl impact windows as per the Escambia County Building Code. These units are to be complete with trims, screens, and low-e glass. DO NOT replace the garage window, leave the shutter. 2.PLUMBING: Replace the hall bathtub with a paneled wall shower unit as per Escambia County Code. Repair surrounding areas, add grab bars and replace the tub faucet with a new, handheld, shower valve set. Install a new handicap accessible pedestal sink with a new faucet. Install a new comfort height toilet with a new floor flange and wax ring. Install a new kitchen sink, faucet with sprayer, 3/4hp garbage disposal and stainless-steel double bowl sink. Install all new ¼ turn brass shut off valves on fixtures, new braided supply lines, and replace any old piping and fittings associated with this repair. 3.ELECTRICAL: Re-wire as needed or required to conform to the national electrical code as per the Escambia County Building Code. This may require additional switches and outlets to be added if the existing space does not meet code requirements...