PROJECT SUMMARY: This project includes the replacement of the existing 2500A switchboard ‘MS’ located in the basement below the main terminal of CLT airport, as well as supplemental architectural/mechanical/plumbing work in the associated project areas. The existing switchgear shall be replaced with two (2) new electrical distribution panelboards and shall have backup power availability through the installation of a generator docking station and manual transfer switch. The new distribution panelboards shall feed all existing circuits energized from existing switchboard ‘MS’. After all existing circuits have been refed, existing switchboard ‘MS’ shall be demolished. The electrical room walls and floors will be infilled, patched, painted, and finished upon completion of equipment installation and testing. SCOPE OF WORK: Refer to construction documents and specifications for an exact detailed scope. Construction shall meet the requirements of all applicable codes and standards as well as intent of construction documents.