The scope of work consists of furnishing all supervision and labor, materials, necessary equipment and tools, utility work, traffic control and public services coordination required for the completion of the Project. The proposed improvements include the installation (re-striping) of pavement markings including but not limited to: Center Lines; Lane Lines; Median Islands; Two-way Left Turn Lanes; Intersection Markings; Bike Lane Lines; Lane Lines Through Intersections; Pavement Word, Symbol, and Arrow Marking; Stop Lines; Crosswalk Lines; Yield Line; Red Curb Marking; Chevron and Diagonal Crosshatch Marking; and installation of raise pavement markers as required by the CA MUCTD 2014 Edition and by Section 84 of the of California Department of Transportation Standard Specifications, the Project’s Standard Specifications, or Special Provisions which shall be performed, placed, constructed, or installed within public streets right-of-way. All work and resulting facilities will fully conform to the current adopted Coachella Valley State Implementation Plan (CVSIP) for PM-10 including Best Management Practices during the construction process. All project work and incidental items to complete the project shall be performed in accordance with the plans, specifications, and other provisions of the contract. All the above improvements are to be constructed in a workmanlike manner, leaving the entire project in a neat and presentable condition.