The Baldwin County Commission, acting by and through the Highway Department, seeks qualifications from qualified engineering consultant firms for the design of the drainage improvements for the Fish River Watershed Sediment and Stormwater Project – Summerdale Stormwater Pond. The Summerdale Stormwater Pond Project’s principal purpose is to reduce sediment runoff and improve stormwater runoff in the Fish River Watershed. This location was identified in the Baldwin County Watershed Modeling Analysis (site JN1) as part of the regional detention project by Baldwin County. The consultant chosen will assist in survey, environmental assessment, geotechnical analysis, environmental permitting, design, utility coordination, plan production, contract preparing, bidding, and construction inspection services (if needed) required to complete the project.