A new community building will be constructed at the heart of the site of an existing affordable housing project which includes five existing two-story residential buildings and a laundry facility. The new community building will be providing a multipurpose space, kitchen, and restroom. A patio will be constructed between the existing laundry room and new community space offering outdoor gathering space to residents. The existing tot-lot will be replaced with new equipment and fall protection surface. Parking lots will be re-sealed and striped, and improvements will be made to walkways on-site to provide accessible path of travel. Mailboxes will be relocated to be along the accessible path of travel. Existing residential buildings will receive exterior rigid insulation and water-resistant barrier at CMU block wall portions. Existing buildings will be painted. (3) units will be upgraded to meet current accessibility requirements. All existing residential units will receive new casework, appliances, plumbing fixtures, interior light fixtures, mechanical systems, flooring, entry doors and screen doors, interior doors, and replacement windows.