Specifications include, but are not limited to: 1. Remove and dispose all 10 current concrete RV pads. 2. Ground work to level out and compacted the proposed area of RV Pads. Leaving the trees at the west end alone to continue growth. 3. Form and pour 10 RV pads starting in the gap of the second and third tree on the east side of the entry road and have one pad per tree gap for the next 10 gaps. 4. RV pads must be level start at the road, must have the same angle from the roadway as current pads. and will be flush with the RV access road. The RV access road will not be a part of this bid proposal. 5. The base shall be a minimum of six (6”) inches of base rock (after compaction to a uniform width of twenty (20’) feet.