0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 500 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 13 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 80 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 120165 CHANNELIZER (SURFACE MOUNTED) EA 510 0009 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 380 0010 120300 TEMPORARY PAVEMENT MARKER EA 800 0011 120320 TEMPORARY BARRIER SYSTEM LF 42,500 0012 124000 TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM 0013 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 4 0014 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 0015 129108 TEMPORARY CRASH CUSHION TL-3 EA 38 0016 129150 TEMPORARY TRAFFIC SCREEN LF 42,500 0017 129152 TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM EA 2 0018 130100 JOB SITE MANAGEMENT LS LUMP SUM 0019 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM 0020 130320 STORM WATER SAMPLING AND ANALYSIS DAY EA 30