0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 180 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 4 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 80 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 120101 TRAFFIC CONTROL SUPERVISOR DAY 180 0009 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 180 0010 120110 FLASHING ARROW SIGN EA 6 0011 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 760 0012 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 107,000 0013 120165 CHANNELIZER (SURFACE MOUNTED) EA 360 0014 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 180 0015 120300 TEMPORARY PAVEMENT MARKER EA 1,390 0016 120320 TEMPORARY BARRIER SYSTEM LF 8,760 0017 124010 TEMPORARY SHUTTLE SERVICE LS LUMP SUM 0018 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 8 0019 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 0020 129108 TEMPORARY CRASH CUSHION TL-3 EA 21