0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 500 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 3 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 10 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 130100 JOB SITE MANAGEMENT LS LUMP SUM 0009 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM 0010 130320 STORM WATER SAMPLING AND ANALYSIS DAY EA 24 0011 130330 STORM WATER ANNUAL REPORT EA 2 0012 130640 TEMPORARY FIBER ROLL LF 10,200 0013 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM 0014 153121 REMOVE CONCRETE (CY) CY 11 0015 170103 CLEARING AND GRUBBING (LS) LS LUMP SUM 0016 190101 ROADWAY EXCAVATION CY 4,520 0017 192037 (F) - STRUCTURE EXCAVATION (RETAINING WALL) CY 226 0018 193013 (F) - STRUCTURE BACKFILL (RETAINING WALL) CY 226 0019 194001 DITCH EXCAVATION CY 38 0020 260303 CLASS 3 AGGREGATE BASE (CY) CY 1,320