1. Lawn (58 acres) will be mowed to a presentable height (i.e. 2-3 inches). Presentable height islocation based and will be determined by the facility POC (or designee) or State POC listed under contractor requirements 2. Contractor must inspect the work site prior to mowing to identify trash or any hazards; such as, water covers, electrical covers, etc. and provide notification to the facility point of contact (or designee) if assistance is needed with the removal of the trash and/or hazard. If equipment (to include water covers, drain covers/pipes, or electrical covers, or any other equipment) is damaged, the contractor is required to notify the site POC or the CFMO office immediately. The contractor isresponsible for repairs and all cost associated with the repairs 3. Contractor willremove/dispose of any debris covering building downspouts and storm water drains throughout the property during every visit. If the drain is blocked or damaged, the contractor will notify the facility POC immediately. 4. Contractor must remove grass clippings and other debris from sidewalks, patios, plant beds, roads, fences, parking areas and similar paved areas throughout the facility grounds. 5. Contractor will provide the site POC with documentation of all Pesticides/Herbicides used at the facility. 6. The contractor will collect and dispose of all trimmings/bushes/limbs and debris. The contractor is responsible for all cost associated with the disposal. 7. Edging: Vendor shall edge all concrete sidewalks of the Cabarrus YDC, Kirk, and McWhorter buildings as requested by the facility POC.