The City of San Diego has established this Project for the replacement of aging water and sewer pipelines within Council District 1 within the La Jolla community. The design consultant will be required to provide services for the following improvements: Water Improvements: Construction of approximately 11,008 LF (2.08 mi) of water mains to replace existing 4-, 6-, 8- 10- and 12-inch AC water mains via open trench, including associated appurtenances. Abandon approximately 611 LF (0.12 mi) of water mains in existing easements. Replace one pressure regulating station with an 8-inch regulating valve. Install approximately 600 LF (0.11 mi) of new water mains on private street with existing easement and transfer existing water services to the new main. Sewer Improvements: Construction of approximately 2,921 LF (0.55 mi) of sewer mains to replace existing 6- and 8-inch VC sewer mains. Rehabilitation of approximately 1,682 LF (0.32 mi) of 8-inch sewer mains. Abandon approximately 1,064 LF (0.20 mi) of 6- and 8-inch sewer mains. Transfer one sewer lateral from abandoned main to the parallel sewer main. Install approximately 675 LF (0.13 mi) of new 8-inch sewer mains.