1 MOBILIZATION per the General Requirements, General Requirements, Sections 01292 and 01721, Modified Class "B" Field Office with Air Conditioning including Internet Access and use of E2020 LS 2 Traffic Control plans preparation and implementation including DOT review and approval per General Requirements, Section 01120 LS 3 Prepare and Implement Stormwater Pollution Prevention Plan (General Requirements, Section 01571) LS 4 Allowance for Payment for Permits per the General Requirements, Sections 01212 & 01292 $20,000.00 5 Allowance for Differing Site Conditions per the General Requirements, Sections 01212, 01253, & 01292 $50,000.00 6 Allowance for Construction Surveying per General Requirements, Section 01722. $50,000.00 7 Allowance for Additional Potholing to Locate, Verify, Remove, Protect, Relocate, and/or Adjust Substructures per General Requirements, Sections 01212 & 01732 $30,000.00 8 Allowance for Clearing and Grubbing per Greenbook sections 300-1, Regrading and Site preparation per General Requirements, Section 01212 $15,000.00 9 Allowance for Bus Shelter Installation per General Requirements, Section 01212 $280,000.00 10 Remove Concrete Curb Type "A" LF 1100