Test and create a condition assessment for inventory of large meters and provide an annual report to CFPUA. Meters are located in vaults outside in public rights of ways or utility easements. a. Condition Assessment should include, but not limited to: i. Exterior and Interior condition of vault, and hatch ii. Test results of meter accuracy iii. Valve and bypass operability iv. Coordinate System 1. Coordinate System 2. At a minimum, the data is to be provided in a well-established and current reference system (GCS) such as WGS 84, ITRFxx, or NAD 83 (2011). 3. Preferably, data should be provided in both the native reference frame used in collection and one that is transformed and projected to WGS 1984 UTM ZONE 18N (m). 4. File Format 5. Submit in an Esri File Geodatabase format that contains a unique link to tie the point and data to our existing meter feature class. b. The Contractor shall perform all Work in accordance with applicable OSHA/ EPA standards and regulations. c. The Contractor shall be responsible for ensuring compliance with OSHA’s permitrequired confined space standard (29 CFR 1910.146) when performing work within meter vaults or other spaces meeting the definition of confined space. d. All confined space equipment necessary for safe entry shall be provided by the Contractor (i.e., atmospheric monitors, confined space ventilators, retrieval equipment, etc.)...