0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 600 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 12 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 240 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 600 0009 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 6,240 0010 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 270,000 0011 120165 CHANNELIZER (SURFACE MOUNTED) EA 320 0012 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 600 0013 120320 TEMPORARY BARRIER SYSTEM LF 27,800 0014 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 0015 129100 TEMPORARY CRASH CUSHION MODULE EA 6 0016 129105 TEMPORARY CRASH CUSHION TL-2 EA 1 0017 129108 TEMPORARY CRASH CUSHION TL-3 EA 25 0018 129150 TEMPORARY TRAFFIC SCREEN LF 27,000 0019 129152 TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM EA 4 0020 130100 JOB SITE MANAGEMENT LS LUMP SUM