0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 335 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 9 6,000.00 54,000.00 0005 090210 HOURLY OFF-SITE DISPUTERESOLUTION-BOARD-RELATED TASKS HR 180 200.00 36,000.00 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM LUMP SUM 0008 120101 TRAFFIC CONTROL SUPERVISOR DAY 330 0009 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 330 0010 120110 FLASHING ARROW SIGN EA 2 0011 120120 TYPE III BARRICADE EA 9 0012 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 10,800 0013 120165 CHANNELIZER (SURFACE MOUNTED) EA 460 0014 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 330 0015 120300 TEMPORARY PAVEMENT MARKER EA 240 0016 120320 TEMPORARY BARRIER SYSTEM LF 16,500 0017 124000 TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM LUMP SUM 0018 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM LUMP SUM 0019 128658 END OF QUEUE MONITORING AND WARNING WITH TRUCK MOUNTED CHANGEABLE MESSAGE SIGN DAY EA 330 0020 129015 MOBILE BARRIER SYSTEM DAY 190