0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 090105 TIME-RELATED OVERHEAD (LS) LS LUMP SUM 0003 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 6 0004 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 5 0005 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0006 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0007 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 24 0008 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 410 0009 120165 CHANNELIZER (SURFACE MOUNTED) EA 61 0010 120320 TEMPORARY BARRIER SYSTEM LF 1,180 0011 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 0012 014105 ALTERNATIVE TEMPORARY CRASH CUSHION TL-3 EA 6 0013 013357 AUTOMATED FLAGGER ASSISTANCE DEVICE LS LUMP SUM 0014 130100 JOB SITE MANAGEMENT LS LUMP SUM 0015 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM 0016 130320 STORM WATER SAMPLING AND ANALYSIS DAY EA 170 0017 130330 STORM WATER ANNUAL REPORT EA 3 0018 130505 MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) EA 1 0019 130510 TEMPORARY MULCH SQYD 6,240 0020 130530 TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX) SQYD 6,240