The Contractor's work shall include the furnishing of all labor, tools and equipment, and materials, as outlined in Section 3.0, “Solar Utility Station Construction Assembly Units” and the installation of those materials and the Owner-Furnished materials as indicated necessary to construct the subject station. The following is a brief structural description of the station, geographic location, and an explanation of the basic Owner/Contractor responsibilities: The ROCKFISH B4.9 SOLAR UTILITY STATION includes: a. Solar panel modules (see drawings for count) b. PV module racking c. String inverters d. 1500V DC Combiner Boxes e. 480V/3500A AC Switchboard(s) f. SCADA and DAS system g. Metering rack with enclosures sensors and wiring h. 15kVA 480V to 120V transformer, mini power zone (MPZ) i. MET station and corresponding instruments and sensors j. 2500kVA 480V to 12.47kV power transformer(s) k. Riser pole with fused cutout and MV surge arrestors l. Recloser pole with MV 3-phase bypass switch, MV 3-phase trip recloser, MV surge arrestors, and SEL-651R m. Aux power pole with MV GOAB switch, MV fused cutout, MV to LV control power transformer (CPT), and MV surge arrestors n. Associated grounding system, conductors, conduit / cable trench system, communication cable, concrete pad(s), yard stone, roads and security fence...