Project includes demolition of existing chiller equipment and associated auxiliary equipment and accessories; construction of new chillers, associated mechanical equipment piping, accessories in the old blower room of the existing Influent/Effluent Building, installation of new electrical power feed system including outdoor transformers, indoor switchgears and MCCs in the electrical room of the Influent Effluent Building and associated instrumentation controls and architectural and structural improvements. Includes execution of Appendix A, Transformer Procurement Novation Contract, including but not limited to processing shop drawings, and O&M manuals, seismic anchorage calculations, unloading and storage of equipment, installation of equipment, electrical testing, start-up, and all other work associated with the procurements not included in the procurement contract as work by the transformer Supplier. Note: Estimated contract cost listed herein does not include cost of transformer equipment procurement contract. Cost of the transformers is accounted for as a separate line item on the cost response page.