THE WORK ON THIS PROJECT SHALL ADHERE TO THE FOLLOWING SPECIFICATIONS, STANDARDS AND/OR REGULATIONS: 3.1. NC DEMLR'S "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" (2013) 3.2. NC DEMLR'S CONSTRUCTION GENERAL PERMIT NUMBER NCG01000 3.3. GENERAL, REGIONAL AND SPECIAL CONDITIONS OF USACE'S 404 NATIONWIDE PERMIT NUMBER 27 3.4. GENERAL AND SPECIAL CONDITIONS OF NCDWR'S 401 WATER QUALITY CERTIFICATION 4134 3.5. THE CONSTRUCTION DOCUMENTS 4. ALL EXISTING UTILITIES MAY NOT BE SHOWN. SOME LOCATIONS MAY BE APPROXIMATE. CONTRACTOR SHALL NOTIFY 'NC811' (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF 'NC811'. REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. ANY UTILITIES SHOWN ON THE CONSTRUCTION DOCUMENTS ARE FOR INFORMATIONAL PURPOSES ONLY AND IN NO WAY RELIEVES THE CONTRACTOR FROM COORDINATING, VERIFYING, AND PROTECTING EXISTING UTILITIES. 5. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR IS RESPONSIBLE FOR COORDINATING CONSTRUCTION ACTIVITIES WITH THE APPROPRIATE UTILITY COMPANIES FOR ANY REQUIRED RELOCATIONS (I.E. POWER POLES, METERS, FITTINGS, ETC.). 6. THE CONTRACTOR IS RESPONSIBLE FOR THE PROJECT AREA UNTIL COMPLETION AND FINAL ACCEPTANCE BY THE ENGINEER AND PROJECT OWNER. THE CONTRACTOR SHALL CONFINE ALL ACTIVITIES, INCLUDING EQUIPMENT STORAGE, TO THE LIMITS OF DISTURBANCE, STAGING AREAS, AND DESIGNATED CONSTRUCTION ACCESS POINTS. 7. THE MANNER IN WHICH THE CONTRACTOR DEALS WITH PEOPLE AND THEIR PROPERTIES WHILE PERFORMING THIS WORK IS EXTREMELY IMPORTANT. THEREFORE, THE CONTRACTOR AND THE CONTRACTOR'S REPRESENTATIVES SHALL MANIFEST A SPIRIT OF FRIENDLINESS AND COOPERATION WHEN DEALING WITH PROPERTY OWNERS AND THE GENERAL PUBLIC WHILE PERFORMING WORK ON THE SITE.