The work covered by this provision consists of clipping high shoulders and reconstructing the earth shoulder in accordance with Roadway Standard Drawing Nos. 560.01 and 560.02, except that the rate of slope and width will be as shown on typical section, or to the existing shoulder point, whichever is nearer, as long as the desired typical is achieved, and when completed, seeded and mulched. Materials - The Contractor shall make use of the existing earth material along the shoulders such that no waste material is generated. The Department will furnish all earth material necessary for the repair of low shoulders when existing earth material is not available on site. The Contractor shall be responsible for hauling the material provided by the Department to the project site...