BASE BID #1 Interior: 1. Demo upper bath flooring and base trim. Prep and install new plywood underlayment, Congoleum Air-Step Plus flooring, and PVC base trim. Caulk all fixtures to flooring. Demo and replace bathroom exhaust fan. Clean and prep bathroom ceiling removing mold, mildew and loose paint. Prime ceiling and wall surfaces with Zinnser mold killing primer. Patch and repaint all drywall surfaces with satin paint finish. Remove and reinstall bathroom accessories as needed. Provide and install new window and door casing to match the new pvc base trim. 2. Provide and install any missing electrical switch and receptacle covers. 3. Update all smoke and CO detectors to meet code. Include electrical wiring as needed to meet code compliance. Base Bid #1 Exterior: 4. Demo existing concrete driveway, including entry approach, and front entry sidewalk. Correct grade at overhead garage door approach and at sidewalk approach to the wood stairs. Form and pour new concrete driveway, curb approaches and entry sidewalk. Curb approach to be full width of the driveway. Concrete to be 4” 4,500psi air entrained exterior mixture. Reinforce with #4 rebar grid 2’ OC each way. Include light broom finish, saw cut control joints. Treat new concrete with cure and seal product. 5. Demo and replace front entry wood steps. Current configuration is constructed over concrete steps. Extend new steps out from landing as needed to clear the concrete step structure below. Install treated cedartone frame materials and 5/4 decking, and risers. Enclose exposed concrete sides. Install treated handrail panels and stair panels, including handrails. New steps to be constructed with 4 risers. 6. Demo and replace rear entry door exterior landing and step. Include new handrail...