1 SP-01 SP-01-7.1 Mobilization and Demobilization 1 Lump Sum 2 SP-02 SP-02-15.1(a) Gravel Construction Entrance (NCDOT 1607.01) 1 Each 3 SP-02 SP-02-15.1(b) Temporary Silt Fence (NCDOT 1605.01) 500 Linear Foot N/A SP-03 Environmental Protection N/A Included in SP-01 N/A SP-04 Permits N/A Included in SP-01 N/A SP-05 Underground Utilities Location N/A Included in SP-07 4 SP-07 SP-07-5.1 Trench Excavation and placement of the CBA for Groundwater Hydraulic Barrier 1 Lump Sum 5 SP-08 SP-08-4.1 Composite Bentonite Aggregate (CBA) 400 Ton N/A SP-09 Site Dewatering N/A Included in SP-07 N/A SP-10 Field Engineering and Survey Requirements N/A Included in SP-07 6 SP-11 SP-11-5.1 Soil Stockpiling, Handling and Disposal 600 Ton 7 SP-11 SP-11-5.2 Liquids Management, Containerization and Disposal 30,000 Gallon 8 SP-12 SP-12-4.1 Backfilling and Compaction 300 Ton 9 SP-12 SP-12-4.2 Permanent Seeding 3 Acre