Assist with assessment of the system and aid in the permitting and procurement process. The scope of work for this project may include but is not limited to the following: •A new aboveground storage tank will be installed to replace the underground storage tank that has been removed. The proposed tank will be in the vicinity of the previous tank. •The two existing fuel dispensers and associated hose reels, hoses, nozzles and the existing Veeder-Root 300C electronic monitoring system will be replaced. The proposed fuel dispensers will be installed in the same location as existing. •The existing underground double-wall wall fiberglass piping from the former underground tank to the top of the gangway will be tested and considered for reuse. •The existing Franklin Fueling metal ducted overwater piping will be tested and considered for reuse. •Existing electrical conduits between the pump and tank electrical area and the former tank area, and between the pump and tank electrical area and the dispensers will be evaluated and considered for reuse.