The Contractor shall furnish all labor, material, equipment, and services required for the construction, inspection, and commissioning of a new sub division. All utilities will be located behind sidewalk (power, sewer, water and communications). Base rock pads will need to be constructed to finished elevation and covered with mold resistant moisture barrier. The homes will be built on cinder block stem-wall foundations (minimum of three high). Allura fiber cement siding (fire Rated), Allura soffits and Vulcan Vents (fire and ember safe vents). Fire rated, Milgard window and doors. Metal snap lock roofing and metal gutters and down spouts. These homes are turn key. All internal finishes shall be installed according to manufacturer’s specifications. (Flooring, Baseboards, Dry Wall, Paint, Plumbing, Electrical, Cabinetry, Lighting will be Title 24 compliant. Please be aware the plans may not reflect scope of work details. All submittals must be pre- approved prior to execution. Project is located adjacent to Hillside Road on Astiip in Happy Camp, California. The above list is intended to serve as a functional description and starting point construction.