1. Lawns will be mowed to a presentable height (i.e. 2-3 inches). Presentable height is location based and will be determined by the facility POC (or designee) or State POC listed under contractor requirements 2. Vendor must inspect the work site prior to mowing to identify trash or any hazards; such as, water covers, electrical covers, etc. and provide notification to the facility point of contact (or designee) if assistance is needed with the removal of the trash and/or hazard. If equipment (to include water covers, drain covers/pipes, or electrical covers, or any other equipment) is damaged, the Vendor is required to notify the site POC or the Construction Facilities Management Office (CFMO) office immediately. The contractor isresponsible forrepairs and all cost associated with the repairs 3. Vendor willremove/dispose of any debris covering building downspouts and storm water drains throughout the property during every visit. If the drain is blocked or damaged, the Vendor will notify the facility POC or the CFMO office immediately. 4. Vendor must remove grass clippings and other debris from sidewalks, patios, plant beds, roads, fences, parking areas and similar paved areas throughout the facility grounds. 5. Pick-up and remove miscellaneous trash/tree limbs/debris during the service visit (year-round) and dispose of properly...