Supply and install new bowl assembly; machine and bore bowl to nominal size. Complete new bowl assembly must be furnished with bid design flow 17,500 GPM@30ft TDH using 161 brake horse power, and 705 RPM. The new bowl assembly will include the following new OEM parts: 1. Cast iron tube adapter 2. Iron bowl 3. Bronze tube adapter screw bearing 4. Bronze bowl bearing 5. Bronze impeller 6. Bronze liner 7. Cast iron suction bell 8. Bronze bell bearing 9. Stainless-steel impeller thrust ring, retainer, and stainless-steel bolts 10. Split key; New OEM Shaft, Couplings, and Column Tubes - 1. Replace Inner Column Tubes and Inner Column Tube Bushings / Bearings with new. 2. Replace all 416 stainless steel shafts (Motor, Head, Middle Line, Lower Line, and Bowl) with new 416 stainless steel shafts. 3. Replace all Line Shaft Couplings with new stainless-steel couplings. 4. Replace Head Nut (1) with new. 5. Replace Center Ring (1) with new...