SPRWS owns all tanks and required equipment to accept and utilize the liquid nitrogen once supplied by the vendor. Liquid nitrogen storage will consist of one 1,390 gallon storage tank with a MAWP of 250 psig. When full, the storage tanks will hold enough liquid nitrogen to satisfy about 42 days of average demand and about 21 days of high demand. The liquid nitrogen tank will have a 1 ½” CGA fill connection located on the tank as indicated in the tank detail drawing provided separately (Appendix C). The liquid nitrogen tank fill connection will be located approximately 3 feet from the edge of the gas tank pad which is separated from the gas truck fill location by a row of bollards. The vendor is responsible for sending the liquid nitrogen in delivery trucks that meet the following criteria: - Are able to connect to 1.5 inch CGA fittings to make deliveries. - Are capable of blowing liquid nitrogen into the tanks installed on site - Are in safe operating condition