1.) All existing BAS software and control hardware shall be replaced with new BAS software and control hardware. This shalltake place in phases to minimize any disturbance to the normal operation of MCF Oak Park Heights. 2.) Replace all space temperature sensors throughoutthe facility with new sensors which are compatible with the new hardware and software. 3.) Replace a selection of other sensors (airtemperature, humidity, water temperature, etc.)throughoutthe facility. 4.) Replace VAV box damper actuators with new electronic actuators. Underthe basic scope,the existing VAV boxes and dampers will be retained in place, and the controls will be replaced. The locations of existing VAV boxes are shown on the drawings. 5.) Replace all existing pneumatic control valves with new control valves, with electronic actuators. This involves pipefitting,to accomplish the entire valve replacement. Replace all existing pneumatic damper actuators with new electronic actuators and linkages. The existing dampers willremain.