Specifications include, but are not limited to: furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City Engineer. Work includes demolition of existing raised planter boxes, fountain equipment, electrical equipment, portions of the existing fountain pool floor concrete slabs, and brick hardscape and railing adjacent to the City Hall cantilever walkway. The project also includes installation of waterfall, geyser, pump, filtration, electrical system, lighting, changeable lighting control system, and irrigation equipment. The upper pool portion of the project includes construction of a paver walking area, overhead and ground level lights, a perimeter glass barrier, and hardscape drainage. Work on the existing pool to the south includes converting the pool into a planter which includes installation of irrigation, drainage, and new plant material to match the existing aesthetic of the Civic Center in the City of La Mirada.