Specifications include, but are not limited to: New Bond shall provide protection to DHR all covered structures and contents against new ground-borne Native Eastern Subterranean termites coming from soil and new ground-borne Formosan termites coming from soil. New Bond coverage shall provide necessary treatment of aerial termites when needed during active bond and renewal term. New Bond shall include automatic renewal coverage if specification requirements are met and maintained. New bond shall include repair, and retreatment coverage to structure and content if specification requirements are met and maintained. New Bond Coverage includes New Bond, installation of Sentricon termite stations and bait in soil within the perimeter around the structures according to guidelines established by manufacturer of system, 1st yr. inspection, and 1st yr. station monitoring for activity, colony reduction or elimination with bait, and subsequent monitoring and baiting, replenishment, replacement, and treatment in bait stations of all covered structures. In addition, New Bond includes renewable coverage, and Repair and Retreatment; all in compliance with the state’s regulations, applicable laws, and manufacturer’s guidelines of Sentricon bait system. Supplier shall always maintain Sentricon bait in bait stations. Supplier shall inspect structures at time of Sentricon Bait system installation for potential formation of new termites and make aware of any potential existing termites for purpose of elimination in preparation of new Bond.