2.1. Provide a complete design including all engineering, including mechanical, electrical and plumbing and architectural disciplines to prepare construction bid documents for advertisement through the West Virginia State Purchasing Division. Key design elements include replacement of all HVAC systems with new and more efficient equipment, building floor plan layout will be required to change to achieve the best use of space, new kitchen equipment, complete restroom renovations, new exterior/interior LED lighting, new exterior/interior doors, new energyefficient windows, new flooring, and new on-demand hot water system. The design shall bring the entire building and all systems to current building codes. 2.2. Designer shall provide all geotechnical work, if required, to include any necessary drill borings, designer shall be responsible for researching and investigating the location of existing underground and above ground utilities, and to provide drawings and specifications of all utility and road infrastructure as needed and directed by the owner and/or state agency, utility company or other utility approval authority for Kingwood, West Virginia. 2.3. Drawings and specifications are to be submitted at 35%, 65%, 95% and 100%, cost estimates are to be revised and submitted with each submittal at 35%, 65%, 95% and 100%. 2.4. Provide construction bid services and administrative services to the Owner.