Specifications include, but are not limited to: furnishment and installation Cured In Place Pipe (CIPP) Liner of approximately 380 lineal feet of 8” to 10” gravity main, removal and replacement of approximately 315 lineal feet of 8” to 10” PVC (SDR 35 or SDR 26) gravity main, removal and replacement of approximately 210 lineal feet of 8” to 15” gravity main at point repairs, removal and replacement of five – 4’ diameter manholes along approximately 95 vertical feet of 4’ diameter manholes to be coated (minimal and significant deterioration), asphalt roadway open cut and repair with final mill and resurfacing, concrete curb removal and replacement, isolation valves, fire hydrants, new residential services, relocation of existing meters requiring access to private property and Florida Department of Transportation (FDOT) and Osceola County applicable permits and the usual appurtenances.