Specifications include, but are not limited to: : furnish all labor, materials and equipment to construct the State Street Water Treatment Project including pretreatment, Granular Activated Carbon (GAC) System, regenerable Ion Exchange System (IX), Ion Exchange Pre-engineered metal building, Chlorine Gas Disinfection Systems, Waste Tank, Yard Piping, Electrical, Instrumentation and Control Integration as identified on the plans and within the project specifications. “Offsite” work may include but not be limited to the following: furnish all labor, materials and equipment to construct the State Street Water Treatment Facility Off-site Pipelines and Fiber Optic Line including dual 6” gravity mains, 16” raw water line, fiber optic facilities, paving, as identified on the plans and within the project specifications.