Specifications include, but are not limited to: 1. Mobilization 1 LS $ $ 2. Disassemble & Store Existing 3-Panel Sign 1 LS $ $ 3. Demolition 1 LS $ $ 4. Earthwork 1 LS $ $ 5. Geotechnical Engineering Services for Material Testing 1 LS $ $ 6. Furnish, Install and Compact - Class 6 Road Base for Sub-Base of Concrete Flatwork, Parking Pads, Use Pad and as directed by Project Manager 80 TON $ $ 7. Furnish & Install 5” Mesa Buff Colored Concrete for Sidewalks & Use Pad 790 SF $ $ 8. Furnish & Install 5” w/ Thickened Edge Mesa Buff Colored Concrete for New Changing Rooms 167 SF $ $ 9. Furnish & Install 6" Mesa Buff Colored Concrete for Parking Pads & 3-Panel Sign Footer 730 SF $ $ 10. Furnish & Install Mesa Buff Colored Concrete Stairs, Per Detail 5/SD-2 1 LS $ $ 11. Furnish & Install New Changing Rooms per Plans & Specifications 1 LS $ $ 12. Reinstall 3-Panel Sign 1 LS $ $ 13. Furnish & Install Boulder Edging (1.5’ – 2.5’ Dia) as directed by Project Manager 15 TON $ $ 14. Furnish & Install Decorative River Rock (2” – 4” Dia) as Directed by Project Manager 0.5 TON $ $ 15. Remove & Replace Existing Restroom Door, Door Frame and Door Hardware 2 EA $ $ 16. Restroom Interior Improvements per Plans & Specifications 2 EA $ $ 17. Furnish & Install Pedestal Grill Per Detail 4/SD-5 1 EA $ $ 18. Furnish, Install and Compact Red colored Class 6 Road Base for Driveways/Roads as Directed by Project Manager 75 TON $ $.