Specifications include, but are not limited to: Planning and Technical Development: a. Provide all drawings, calculations, engineering, schedules, and submittals necessary to obtain all permits, permissions, and preconstruction approvals required for the project. b. Confirm that all equipment specified in this solicitation is suitable and appropriate for the designated use. c. Provide all preconstruction documents as designated in Schedule C - Supplemental conditions. Site Work: a. Site Survey: The contractor will conduct a survey to review the site requirements for the designated installation location(s). b. Site Preparation: The site will be prepared to ensure that the area is level and free of debris or other obstacles that may interfere with installation. Barriers, fencing, and other necessary equipment will be installed to assure both public and worksite safety for the duration of the project. c. Excavation: Provide all general excavation, pavement, and concrete cutting, trenching, bedding, encasement, conduit, and wiring required for the project. d. Restoration: All affected roadways, walkways, lawns, irrigation systems, and landscaping will be restored to their original condition. e. Protective Bollard(s): Two protective bollards shall be installed in front of each charging station. Equipment Installation: a. Charging Stations: Base Bid: Five (5) level II ChargePoint EVSE CP6021B Dual Port Pedestal Mount Electric Vehicle Charging Stations will be installed at the site, including all necessary hardware and software. Installation shall be in accordance with the manufacturer’s instructions as described in [CP6000 Site-Design Guide]. Alternate 1: Four (4) additional level II ChargePoint EVSE CP6021B Dual Port Pedestal Mount Electric Vehicle Charging Stations will be installed at the site, including all necessary hardware and software. These will be installed in front of the building in the publicfacing lot indicated on the site diagram. Alternate 2: Four (4) additional level II ChargePoint EVSE CP6021B Dual Port Pedestal Mount Electric Vehicle Charging Stations will be installed at the site, including all necessary hardware and software. These will be installed near the building at 1090 Tower Hill Rd, indicated on the site diagram. Installation shall be in accordance with the manufacturer’s instructions as detailed in the provided specification document. b. Mounting: The charging stations will be mounted securely to a concrete pad or other suitable foundation according to the manufacturer’s specification and equipped with two protective bollard(s) per station. c. Conduit and Wiring: Conduit and wiring will be installed from the charging stations to the electrical panel.