Specifications include, but are not limited to: construction of asphalt walking trails, a basketball court, the installation of stormwater drainage pipes and bulkheads, erosion and sediment control measures, regrading, seeding, irrigation of baseball/softball fields and multipurpose fields, and chain link fence and gate at the ditch crossing towards the northeast corner of the site. The installation of the chain link fence and gate shall only include removal of the existing chain link fence at the location shown on the plans sufficient to install the gate within the existing fence. All proposed improvements will be constructed within the existing Smithville District Park site; the park will need to remain open while construction activities take place.