Specifications include, but are not limited to: The Town wishes to retain the services of a Professional Engineering Firm, appropriately licensed and insured, to study the existing conditions of the source and supply for the existing and proposed irrigation system, and to explore alternatives to the same. It is anticipated that the following scope of services would be included in the Study. Consultant will at a minimum: * Evaluate the two existing production wells. The goal is to determine if they can (should) be deemed sufficient for the proposed irrigation system, redeveloped, or redrilled. Well #2 was redeveloped in May, 2024, including the installation of a new well pump. The 100 hp motor was replaced in August, 2023. Well #3, located in the main Pump House, was redeveloped in 2018, with installation of new casing and screen, and, in 2021, a new well pump was installed. Documents regarding the redevelopment of both wells are attached to this RFQ. * Evaluation of the flooding potential for the two existing production wells and the pressure maintenance well, and what mitigation could be offered. There is a recent Pump House Flooding Evaluation report attached to this RFQ. Higher recurrence interval storms (e.g. 1% and 0.2%) should be considered in the Study. The Consultant will calculate the elevation that Wells #2, #3, and the Pressure Maintenance Well would need to be raised to be above the higher storms flooding potential...