Specifications include, but are not limited to: CAPACITY The Generator must be rated and able to perform under testing conditions to meet the full load demand of the Acton Public Library’s interior and exterior electrical needs. The Generator must support the facility during a power outage as if there was no loss of power. The Acton Public Library serves as an essential municipal facility during emergencies. ALL WORK INCLUDED The vendor making proposals shall be able to provide all services and work required for the proper installation of the new generator. This includes, but is not limited to: • Obtaining required Permits • Coordination with Eversource • Sitework • Crane Services • New GeneratorDelivery • Electrical Work DETAILED PRICING REQUIRED The vendor making proposals shall provide detailed pricing information including but not limited to: • Permits • Eversource Fees • Crane Services • Delivery • Sitework • Electrical Work • Testing Each category must be detailed, identifying parts and labor costs clearly. A payment schedule must be included. If one is not included, it will be assumed that only one payment be required following the completion of all work and final testing. FUEL The new Generator must be a powered by a redundant power supply. (Oil Based Product, not natural gas.) COLOR Tan or Green WARRANTY Respondents must provide detailed warranty Information. Annual service plan information with detailed costs may be submitted for consideration.