The Morena Pipeline project includes the removal and replacement of 16" cast iron water distribution main with polyvinyl chloride (PVC) (approx. 14,686 LF) and the installation of a 36" Welded Steel Pipe water transmission main (approx. 18,308 LF) and associated appurtenances. The Morena Pipeline move north along Morena Boulevard and Old Morena Boulevard from Napa Street to Balboa Avenue. Morena Boulevard Median: Construction of raised stamped concrete median and pedestrian fence. Restriping of existing edge marker and existing turn pocket on Morena Boulevard and restriping of new continental crosswalks. Morena Improv 3 (Sewer): Construction consists of the installation of approximately 778 LF of 15-inch sewer mains, including all associated laterals, manholes, trench restoration and all other work and appurtenances in accordance with these specifications and plans. Morena Improv 3A (Water): Construction consists of the installation of approximately 391 LF of 12-inch water mains, including all associated water services, fire hydrants, trench restoration, and all other work and appurtenances in accordance with these specifications and plans. Morena Pipeline (BL) This project will install bicycle facilities, sharrows, signage, flex post, and bike loops on the following location: W Morena Blvd between Morena Blvd (N) to Morena Blvd (S) Morena Blvd between W Morena Blvd and MTS Trolley Line Napa Street between Morena Blvd and Friars Rd.