Specifications include, but are not limited to: 0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM; 0002 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 85; 0003 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM; 0004 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM; 0005 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 124,000; 0006 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 110; 0007 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM; 0008 129152 TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM EA 2; 0009 129161 AUTOMATED FLAGGER ASSISTANCE DEVICE DAY EA 110; 0010 130100 JOB SITE MANAGEMENT LS LUMP SUM; 0011 130201 WATER POLLUTION CONTROL PROGRAM LS LUMP SUM; 0012 190185 SHOULDER BACKING TON 2,560; 0013 014397 PARTIAL DEPTH RECYCLING SQYD 85,400...